2018 BMW M3

EXECUTIVE PACKAGE

SUMMER Sales EVENT – GUARANTEED MOTOR CARS
NATIONWIDE DELIVERY AVAILABLE!!
CPO-Quality Vehicles. Market-Driven Pricing. Serious Approvals.

We’re spotlighting some of the cleanest inventory in the MIDWEST.

At Guaranteed Motor Cars, we specialize in exceptionally well-kept, fully inspected vehicles — selected for condition, options, and overall quality.
  • Market-Positioned Pricing
  • Aggressive Financing Approvals
  • Credit Challenge Welcome
  • Trade-In Assistance
  • Fast, Professional Buying Experience
This event is built for buyers who care about quality, strong approvals, and a smooth transaction.

History & Pricing Tools

Features

Exterior
Mineral Gray Metallic
Interior
Silverstone
Drivetrain
Rear Wheel Drive
Engine
3.0L 6 Cylinders
Horsepower
Torque
Transmission
Automatic
Style
Sedan

Included Packages & Options

Option
Original
MSRP ($)
EXECUTIVE PACKAGE
Heated Rear Seats
Parking Assistant
Icon Adaptive Full LED Headlights
Head-Up Display
Heated Steering Wheel
Automatic High Beams
Park Distance Control
Side & Top View Cameras
$4,100
MINERAL GRAY METALLIC
$550
SILVERSTONE, EXTENDED MERINO LEATHER SEAT UPHOLSTERY
$950
TRANSMISSION: 7-SPEED M-DOUBLE CLUTCH
Drivelogic
$2,900
WHEELS: 19" X 9" FRONT/19" X 10" REAR
M Forged
Double-Spoke
Style 437M
Tires: 255/35R19 Front & 275/35R19 Rear
Mixed Performance
$1,200
Additional Options
$800
Total Added Value
$10,500

Description

Experience the perfect blend of athletic aggression and sophisticated elegance with this stunning 2018 BMW M3 Sedan. Wrapped in a sleek Mineral Gray Metallic exterior, this high-performance luxury vehicle commands attention on any road while projecting an understated, modern aesthetic. Open the door to reveal a beautifully contrasted cabin featuring premium Silverstone Extended Merino Leather seat upholstery, offering an upscale environment that perfectly matches the vehicle's bold exterior styling. This iconic sport sedan is designed for drivers who refuse to compromise on visual impact or executive presence.

At the heart of this 2018 BMW M3 is a formidable 3.0L 6-cylinder engine that delivers relentless power and a thrilling exhaust note. This potent powerplant is mated to a lightning-fast 7-speed M-double clutch transmission, which provides instantaneous gear changes for an incredibly engaging driving experience. To ensure maximum power delivery and razor-sharp handling, this sedan sits on staggered premium wheels measuring 19" x 9" in the front and 19" x 10" in the rear, providing the optimal footprint for both straight-line stability and precise cornering.

Beyond its track-bred performance, this sedan delivers exceptional daily comfort and high-end convenience thanks to the inclusion of the premium Executive Package. The luxurious Silverstone Extended Merino Leather seating wraps passengers in supreme comfort, reinforcing the vehicle's premium status. With its remarkable fusion of everyday versatility, premium comfort, and legendary engineering, this 2018 BMW M3 Sedan stands out as the ultimate choice for enthusiasts seeking a top-tier sports sedan.

Specifications

Tire - Front: Tires - Front Performance
Tire - Rear: Tires - Rear Performance
Exterior
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Galvanized Steel/Aluminum/Composite Panels
LED Brakelights
Light Tinted Glass
Lip Spoiler
Perimeter/Approach Lights
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Tire Mobility Kit
Trunk Rear Cargo Access

Disclaimer

We offer a "First Come and First Serve policy" in order to be fair to all customers. The vehicle may have minor road chips, scratches, wheel scuffs, etc. Depending on the age of the vehicle, normal wear and tear should be anticipated. Please check to be sure the vehicle is available prior to your arrival. All advertised prices exclude government fees and taxes, any finance charges, any dealer document processing charge, and any emission testing charge. We offer Advantage Asset Protection up to $3897. While we try to make sure that all prices posted here are accurate, we cannot be responsible for typographical and other errors that may appear on the site. If the posted price for a vehicle or service is incorrect due to typographical or other error (e.g., data transmission), the dealership and its representatives are only responsible for the correct price, which we will endeavor to provide to you as soon as we become aware of the error. We make every effort to provide you the most accurate, up-to-the-minute information; however it is your responsibility to verify with the dealership that all details listed are accurate. Vehicle images and descriptions posted on our website are the representations provided by our suppliers. Please note that actual vehicle may differ slightly from specifications and/or the pictures. Dealer Fees consist of $1295 Cerma Prep Fee, $377.63 Doc Fee, and *$35 ERT fee on all our vehicles (*this fee only applies for vehicles registered in the state of IL). For our Out of State buyers it is an additional $680 Out of State Fee. The dealership makes no representations, expressed or implied, to any actual or prospective purchaser or owner of this vehicle as to the existence, ownership, accuracy, description, or condition of the listed vehicle's equipment, accessories, price, or any warranties. Any and all differences must be addressed prior to the sale of the vehicle. All rates and offers are dependent on bank approval, which varies based on applicant's creditworthiness as well as the vehicle. 15 days or 500 miles Implied Warranty applies per state laws. All deal cancellation or deposit cancellations are subject up to a 20% restocking fee of vehicle sale price. All vehicles are offered for sale by Guaranteed Motor Cars. Listed prices do not include applicable government fees, taxes, finance charges, dealer documentation fees, add-ons, or emissions testing costs. The quoted price for each vehicle does not include licensing, registration, taxes, dealer prep, Luxury Package, interior protection, Ceramic Package, transport fees, or insurance.

All terms, conditions, and warranties regarding the vehicle must be explicitly documented and signed; verbal or email communications do not constitute valid agreements or commitments.The dealer makes no warranties, expressed or implied, regarding the condition, equipment, or accuracy of the vehicle listing. Any discrepancies or questions must be addressed and clarified prior to the completion of the purchase.

All vehicles have been marked as used by the seller. The listed features and accessories are based on manufacturer descriptions at the time of manufacture. Buyers are encouraged to review photographs for included items such as owner's manuals, extra keys, and maintenance records. All listings include a photograph depicting available accessories and features.

Nothing herein, including any verbal assurances, representations, or promises, shall be deemed to have been made, implied, or created unless explicitly documented in a signed, written agreement.

Guaranteed Motor Cars endeavors to provide accurate and current information regarding its vehicle inventory. However, there may be occasional errors or omissions. The details and accessories listed for each vehicle may not reflect all items included, and pricing information is subject to change without notice. All inventory is subject to prior sale, and prices are valid only until midnight on the specified date. Prices are based on the state where the dealer is physically located and may vary if the vehicle is transferred to a different state. The dealer disclaims responsibility for inaccuracies and recommends that prospective buyers verify all details in person.
Interested? Tap here for contact options.

Shopping Tools

Unlock Payments

Enter your info and instantly unlock your payment details
Verification Required

Schedule a Test Drive

Please fill out the fields below
Verification Required

Text Link to Phone

Please fill out the fields below
Verification Required

Manager's Special

Please fill out the fields below
Verification Required
Your Request has been submitted successfully
Our team will contact you soon.
Unable to submit form

Ask a Question

Please fill out the fields below
Verification Required
Accessibility Widget Spinner: White decorative
Hide white left arrow Unhide